U.S. Department of Defense
✏️ Amended Active

3D Metal Printer for the Army

U.S. Department of Defense
Amended Jul 9, 2026 · 04:00 UTC
schedule
Offers due in 1 day

The Army needs a small business to supply and install a 3D metal printer system at Fort Hood, TX.

Key Details

The Army needs a complete metal powder bed fusion 3D printing system, including physical delivery, onsite installation, OEM-led operator training, and operational verification. The system must be configured and supplied with a single 400-Watt laser, extended build height, and integrated powder handling glove box. Installation services include onsite unboxing, physical setup, utility connection, and system calibration/verification by certified OEM technicians. OEM-led training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting.

  • What's the contract structure and timeline?

The notice doesn't say.

  • How will they pick the winner?

The notice doesn't say.

  • When and how do you bid?

Submit your quote through SAM.gov by 15:00 CST on July 9, 2026.

Who can apply

  • Any certified small business may apply.

If you're interested, do this first

  • Check that your small business is registered in SAM.gov.

Primary point of contact

Name
Marvin Hopkins
Email
marvin.e.hopkins4.mil@army.mil

Get matched opportunities delivered daily, for free.

The set-asides that fit your business, in plain English — delivered every morning.