The Army needs a small business to supply and install a 3D metal printer system at Fort Hood, TX.
Key Details
The Army needs a complete metal powder bed fusion 3D printing system, including physical delivery, onsite installation, OEM-led operator training, and operational verification. The system must be configured and supplied with a single 400-Watt laser, extended build height, and integrated powder handling glove box. Installation services include onsite unboxing, physical setup, utility connection, and system calibration/verification by certified OEM technicians. OEM-led training includes system operation, powder handling, reactive metal safety, job setup, maintenance, and troubleshooting.
- What's the contract structure and timeline?
The notice doesn't say.
- How will they pick the winner?
The notice doesn't say.
- When and how do you bid?
Submit your quote through SAM.gov by 15:00 CST on July 9, 2026.
Who can apply
- Any certified small business may apply.
If you're interested, do this first
- Check that your small business is registered in SAM.gov.