Provide construction services for design-bid-build project to replace the hydraulic bollard system outside the East building three (3) bay loading dock to include the 27 hydraulic bollards and associated equipment and controls. The north and south loading dock bays entrances has ten (10) bollards outside the loading dock doors for protection and the center loading dock bay entrance has seven (7) bollards outside the loading dock door. This requirement is being held for holders of the GC/DB Zone A IDIQ.
NEW Active
DOT HQ Moveable Bollards
Federal agency
Updated Jun 4, 2026 · 15:26 UTC
Get the daily digest by email.
A summary of every new set-aside opportunity, in your inbox by 9:00 a.m. Eastern. Free, no spam, unsubscribe anytime.