Federal agency
NEW Active

J023--Van lift Gate Installation

Federal agency
Updated Jun 24, 2026 · 20:09 UTC
schedule
Offers due in 5 days
info
This is a Sources Sought notice.

The agency is gauging market interest. No bid is being requested yet — submitting a capabilities statement may put you on the radar for the eventual solicitation.

Scope of Work (SOW) Lift Gate Installation for Sprinter Van Project Overview: The contractor shall provide all labor, materials, supervision, transportation, and equipment necessary to supply and install one (1) new 1,100-lb capacity hydraulic lift gate onto the designated Sprinter van. The installation must be conducted in accordance with all manufacturer specifications, safety standards, and applicable federal, state, and local regulations. Technical Requirements: Provide and install one (1) new rear-mounted hydraulic lift gate assembly. Minimum load capacity: 1,100 pounds. Lift gate must be compatible with the existing Sprinter van make and model. Provide all required hardware, wiring, brackets, hydraulic components, and fasteners. All electrical work shall comply with vehicle manufacturer guidelines and safety standards. Lift gate shall include corrosion-resistant materials suitable for coastal climates. Upon completion, perform full operational testing, safety verification, and functional load testing.

Get the daily digest by email — free.

A summary of every new set-aside opportunity, delivered to your inbox daily.Free, no spam, unsubscribe anytime.

Continue with Google