U.S. Department of Agriculture
Active

Kinzua Creek AOP Replacement

U.S. Department of Agriculture
Updated Jul 7, 2026 · 11:43 UTC

The USDA needs a small business to replace a 42-inch x 50-inch x 45-foot Corrugated Metal Pipe Arch with a new one designed for aquatic organism passage.

Key Details

  • What exactly do they need?
  • The USDA needs a small business to replace a 42-inch x 50-inch x 45-foot Corrugated Metal Pipe Arch with a new one designed for aquatic organism passage.
  • The new arch must be 128-inch x 83-inch x 44-foot in size.
  • A 600-foot section of roadway needs to be reconstructed.
  • Driving surface aggregate needs to be placed and compacted on the reconstructed road surface.
  • What's the contract structure and timeline?
  • This is a Request for Quotation (RFQ) for a single installation project.
  • The notice doesn't say how long the project will take.
  • How will they pick the winner?
  • The evaluation basis isn't specified in the notice.
  • When and how do you bid?
  • Submit a quotation to the agency by July 21, 2026, 7:00 PM ET.

Routine commodity buy — low-effort bid, modest payoff.

Who can apply

  • 8(a) certified (a small-business program for socially/economically disadvantaged owners)
  • Has experience in highway construction

If you're interested, do this first

  • Check that your small business is registered in SAM.gov
  • Review the solicitation number 12445526Q0084 for more information

Primary point of contact

Name
BOUCHER, PAUL A
Email
paul.boucher@usda.gov

Get matched opportunities delivered daily, for free.

The set-asides that fit your business, in plain English — delivered every morning.