Amendment 0001 is to add the question and answers document and to upload the updated SOI. This project is intended to repair the damaged septic drain line of a RV dump station. The work for this project shall consist of the construction and associated site work for the following base items: Cutting and removing the concrete around the hydrant area to access the damaged section of pipe. Excavating a trench using tractor equipment, including the operator, labor, and materials. Jackhammering concrete as needed to expose the broken line. Removing the damaged pipe section, including any failed fittings. Replacing the affected portion of the line with new line/piping and proper fittings. Backfilling the trench once repairs are complete. Pouring new concrete over the area and finishing it to a rough grade (this includes the concrete barrier stop). Soil erosion control/site stabilization measures *Optional items: Replacing 2 barrier wooden logs (shall be staked or fastened to ground so they remain stabilized in place) Replacing 6 wooden pole logs Replacing 2 wooden signposts (install existing signs on new posts)
NEW Active
Lake Sinclair Dump Station Repair
Federal agency
Updated Jun 1, 2026 · 15:34 UTC
schedule
Offers due in 7 days
Get the daily digest by email.
A summary of every new set-aside opportunity, in your inbox by 9:00 a.m. Eastern. Free, no spam, unsubscribe anytime.