U.S. Department of Agriculture
NEW Active

Reroute Power Supply at Phoenix Rearing Facility

U.S. Department of Agriculture
Updated Jul 16, 2026 · 18:25 UTC

The USDA needs a small business to reroute power supply and control wires at the Phoenix Rearing Facility.

Key Details

  • What exactly do they need?
  • A licensed electrician to reroute power supply and control wires at the Phoenix Rearing Facility.
  • The electrician must remove the 2 conduit tripping hazard and reroute the supply power and control wires overhead to the mixing blender.
  • The breaker panel for the 240-volt 3 phase supply power is located in the next room where the electrician will have to run new conduit through a wall to the mixing blender.
  • The control wire panel is located within 10 feet from the mixing blender.
  • What's the contract structure and timeline?
  • This is a 100% Small Business Magnitude contract.
  • The contract is for a fixed amount under $25,000.
  • How will they pick the winner?
  • The notice doesn't say.
  • When and how do you bid?
  • Email your questions to Erick Plamann by 12:00 PM Central Time on 7/29/2026.
  • Email your offer to Erick Plamann by 12:00 PM Central Time on 8/12/2026.

Who can apply

  • Any certified small business may apply.
  • Has experience with electrical work and conduit installation

Heads up — easy to miss

  • There's a mandatory site visit on 23 July 2026 at 10:00 AM at 3645 E. Chipman RD, Phoenix AZ 85040.

If you're interested, do this first

  • Email Erick Plamann to RSVP for the site visit.
  • Check that your small business certification is still active in SAM.gov

Primary point of contact

Name
Erick Plamann
Email
erick.plamann@usda.gov

Get matched opportunities delivered daily, for free.

The set-asides that fit your business, in plain English — delivered every morning.