The Army needs a Service-Disabled Veteran-Owned Small Business to build a temporary data center in Saint Louis, MO.
Key Details
- What exactly do they need?
- Construction of a temporary data center: The Army needs a Service-Disabled Veteran-Owned Small Business to build a temporary data center in Saint Louis, MO.
- Site work: The contractor will perform surrounding site work for the data center.
- Switchgear pads and enclosures: The contractor will build two (2) switchgear pads and enclosures.
- Survey for hazardous containing materials (HCMS): The contractor will conduct a survey for HCMS on the site.
- Remediation of HCMS: The contractor will remediate any hazardous materials found on the site.
- Ameren Electric and AT&T line relocations: The contractor will relocate Ameren Electric and AT&T lines.
- What's the contract structure and timeline?
- The notice doesn't say.
- How will they pick the winner?
- The notice doesn't say.
- When and how do you bid?
- The notice doesn't say.
Who can apply
- Must be a certified Service-Disabled Veteran-Owned Small Business (SDVOSB)
If you're interested, do this first
- Check that your Service-Disabled Veteran-Owned Small Business certification is still active in SAM.gov.
- Review the solicitation number W912DQ26CA037 and ensure you can meet the requirements.
Primary point of contact
Name
Exavier Coburn
Email
exavier.b.coburn@usace.army.mil
Phone
(816) 389-3412