U.S. Department of the Army
NEW Active

Vinyl Flooring Installation for Army Building

U.S. Department of the Army
Updated Jun 2, 2026 · 20:57 UTC

The Army needs a small business to install vinyl flooring in a high-traffic building at Fort Bliss, TX.

Key Details

  • What exactly do they need? The Army needs a small business to remove the current flooring and install durable, long-lasting vinyl flooring in high-traffic areas within rooms 114, 115, 116, 117, 118, 119, 120, 122, and 124 located in building 1001 at Fort Bliss, TX. The work includes demolition of existing flooring, proper handling and disposal of materials in accordance with environmental requirements, preparation of the concrete subfloor, and installation of new flooring. Replacement includes 4-inch vinyl base with toe throughout all designated rooms. Install new vinyl flooring in eight (8) rooms measuring 11 ft X 16 ft and one (1) room measuring approximately 12 ft X 37 ft (approx. 1,500 sq ft total for all rooms).
  • What's the contract structure and timeline? The contract is a firm-fixed-price contract with a period of performance of approximately 30 days. The notice doesn't say.
  • How will they pick the winner? The notice doesn't say.
  • When and how do you bid? Submit your proposal through SAM.gov by June 17, 2026, at 5:00 PM ET.

Who can apply

  • Must be 8(a) certified (a small-business program for socially or economically disadvantaged owners)

If you're interested, do this first

  • Check that your 8(a) certification is still active in SAM.gov.
  • Review the solicitation and ensure you can meet the requirements for the project.
  • Contact the contracting officer to confirm the solicitation details.

Primary point of contact

Email
charles.d.johnson12.civ@army.mil

Get the daily digest by email.

A summary of every new set-aside opportunity, in your inbox by 9:00 a.m. Eastern. Free, no spam, unsubscribe anytime.

Sign up with Google